Terminal D embodies much of what Hutchison Ports Thailand (HPT) has been steadily looking to accomplish over the past few decades at Laem Chabang Port; increasing our presence, and in turn the sustainability of the Port itself. The investment into Terminal D is the collective manifestation of our work and looks to become a beacon for other terminals around the region to emulate.

Construction of terminals D1, D2 and D3 commenced in 2016. The initial Phase 1A of Terminal D comprises of 400 metres of deep-water berth, 3 super post-panamax quay cranes and 10 supporting yard cranes, and commenced “soft” operations in mid-2018.

By the middle of 2019, the remaining Phase 1B of this first phase of Terminal D will be completed, delivering a combined total of 1,000 metres of berth, 6 quay cranes and 20 supporting yard cranes.

When completed, a total of 17 quay cranes and 43 rubber tyred gantry cranes, using remote control technology, will be deployed. The quay cranes will be capable of handling the largest ocean faring vessels in the world.

General Information

Terminal D is a container terminal located at Basin 2 of Laem Chabang Port. The terminal will include a 1700-metre quay equipped with some of the latest technology, facilities, and largest equipment currently at Laem Chabang Port. The annual handling capacity at Terminal D is expected to be around 3.4 million TEUs.

0
BERTH LENGTH (METRES)
0
DEPTH AT MEAN SEA LEVEL (METRES)
0
TOTAL AREA (HECTARES) 
Quay Cranes 24 rows: 17
Rubber Tyred Gantry Cranes: 43
Reachstackers: 10
Empty Container Handlers: 4
Tractors: 105
Chassis: 113
Low Bed Chassis: 2
Forklifts: 3.0T : 1 Units, 5.5T : 7 Unit,
10.0T : 1 Unit, 15.0T : 1 Unit
Ground Slots (TEU): 13,410
Reefer Plugs: 1,860